step1.

博仁设计顾问接洽—— 需求分析及项目定位探讨—— 深度交流介绍设计流程及设计理念

Boren Design Consultant Contact - Requirements Analysis and Project Positioning Discussion - In-depth communication introduces design process and design concept

step2.
签订设计合同
Sign the contract(Project prepayment)

step3.
平面草图绘製——概念方案
Sketching plane—— The concept scheme

step4.
设计製作过程—–方案沟通及修改—-设计委託方确定最终设计方案
The Design of the production process—- Project Communication and modification — Design of client to determine the final design(second sum of money)

step5.
施工图製作过程—–设计委託方确认施工图文件—-交接完整版设计文件(方案文件–效果图–施工图–物料表等)
Construction drawing production process — Principal confirm drawing documents —- Full version of the design file transfer(Program documents–Renderings–Working drawing–Material tables,etc)(Third sum of money)

step6.
施工跟进—–施工问题指导及解决
Construction follow up — Construction guidance and solving problems( Pay the balance due)

step7.
项目完成—-专业摄影—-平台推广与宣传
Project Completion — Professional Photography —Platform for promotion and publicity.